Skip to content

jackcompton/critical-path-css-rails

Repository files navigation

critical-path-css-rails Code Climate

Only load the CSS you need for the initial viewport in Rails!

This gem give you the ability to load only the CSS you need on an initial page view. This gives you blazin' fast rending as there's no initial network call to grab your application's CSS.

This gem assumes that you'll load the rest of the CSS asyncronously. At the moment, the suggested way is to use the loadcss-rails gem.

This gem uses Penthouse to generate the critical CSS.

Update

Versions below 0.3.0 are not compatible with this version. Please read the Upgrading from Previous Versions section below for more information.

Installation

Add critical-path-css-rails to your Gemfile:

gem 'critical-path-css-rails', '~> 1.0.0'

Download and install by running:

bundle install

Run the generator to install the rake task and configuration file:

rails generate critical_path_css:install

The generator adds the following files:

  • config/critical_path_css.yml Note: This file supports ERB.
  • lib/tasks/critical_path_css.rake

Usage

First, you'll need to configue a few things in the YAML file: config/critical_path_css.yml

  • manifest_name: If you're using the asset pipeline, add the manifest name.
  • css_path: If you're not using the asset pipeline, you'll need to define the path to the application's main CSS. The gem assumes your CSS lives in RAILS_ROOT/public. If your main CSS file is in RAILS_ROOT/public/assets/main.css, you would set the variable to /assets/main.css.
  • routes: List the routes that you would like to generate the critical CSS for. (i.e. /resources, /resources/show/1, etc.)
  • base_url: Add your application's URL for the necessary environments.

Before generating the CSS, ensure that your application is running (viewable from a browser) and the main CSS file exists. Then in a separate tab, run the rake task to generate the critical CSS.

If you are using the Asset Pipeline, precompiling the assets will generate the critical CSS after the assets are precompiled.

rake assets:precompile

Else you can generate the critical CSS manually using the below task:

rake critical_path_css:generate

To load the generated critical CSS into your layout, in the head tag, insert:

<style>
    <%= CriticalPathCss.fetch(request.path) %>
</style>

A simple example using loadcss-rails looks like:

<style>
  <%= CriticalPathCss.fetch(request.path) %>
</style>
<script>
    loadCSS("<%= stylesheet_path('application') %>");
</script>
<link rel="preload" href="<%= stylesheet_path('application') %>" as="style" onload="this.rel='stylesheet'">
<noscript>
    <link rel="stylesheet" href="<%= stylesheet_path('application') %>">
</noscript>

Route-level Control of CSS Generation and Removal

CriticalPathCss exposes some methods to give the user more control over the generation of Critical CSS and managment of the CSS cache:

CriticalPathCss.generate route         # Generates the critical path CSS for the given route (relative path)

CriticalPathCss.generate_all           # Generates critical CSS for all routes in critical_path_css.yml

CriticalPathCss.clear route            # Removes the CSS for the given route from the cache

CriticalPathCss.clear_matched routes   # Removes the CSS for the matched routes from the cache

NOTE: The clear_matched method will not work with Memcached due to the latter's incompatibility with Rails' delete_matched method. We recommend using an alternative cache such as Redis.

In addition to the critical_path_css:generate rake task described above, you also have access to task which clears the CSS cache:

rake critical_path_css:clear_all

NOTE: The critical_path_css:clear_all rake task may need to be customized to suit your particular cache implementation.

Careful use of these methods allows the developer to generate critical path CSS dynamically within the app. The user should strongly consider using a background job when generating CSS in order to avoid tying up a rails thread. The generate method will send a GET request to your server which could cause infinite recursion if the developer is not careful.

A user can use these methods to dynamically generate critical path CSS without using the rake critical_path_css:generate rake task and without hardcoding the application's routes into config/critical_path_css.yml. See this Gist for an example of such an implementation.

Upgrading from Previous Versions

The latest version of Critcal Path CSS Rails changes the functionality of the generate method. In past versions, generate would produce CSS for all of the routes listed in config/critical_path_css.yml. This functionality has been replaced by the generate_all method, and generate will only produce CSS for one route.

Developers upgrading from versions prior to 0.3.0 will need to replace CriticalPathCss:generate with CriticalPathCss:generate_all throughout their codebase. One file that will need updating is lib/tasks/critical_path_css.rake. Users can upgrade this file automatically by running:

rails generate critical_path_css:install

Answer 'Y' when prompted to overwrite critical_path_css.rake. However, overwriting critical_path_css.yml is not necessary and not recommended.

Versions

The critical-path-css-rails gem follows these version guidelines:

patch version bump = updates to critical-path-css-rails and patch-level updates to Penthouse
minor version bump = minor-level updates to critical-path-css-rails and Penthouse
major version bump = major-level updates to critical-path-css-rails, Penthouse, and updates to Rails which may be backwards-incompatible

Contributing

Feel free to open an issue ticket if you find something that could be improved. A couple notes:

  • If the Penthouse.js script is outdated (i.e. maybe a new version of Penthouse.js was released yesterday), feel free to open an issue and prod us to get that thing updated. However, for security reasons, we won't be accepting pull requests with updated Penthouse.js script.

Copyright Mudbug Media and Michael Misshore, released under the MIT License.

About

Only load the CSS you need for the initial viewport in Rails!

Resources

License

Stars

Watchers

Forks

Packages

No packages published

Languages

  • Ruby 94.3%
  • JavaScript 3.3%
  • Shell 1.1%
  • HTML 1.1%
  • CSS 0.2%