+* `css_paths`: If you have the need to specify multiple CSS source files, you can do so with `css_paths`. Note that `css_path` and `css_paths` are **mutually exclusive**; if using `css_path`, configuration for `css_paths` should be omitted, and vice versa. When using this option, a separate CSS path must be specified for each route, and they will be matched based on the order specified (the first CSS path will be applied to the first route, the second CSS path to the second route, etc).
0 commit comments