Griffin and Gerstenmaier at STS-118 Launch
NASA Administrator Michael Griffin (foreground) watches the launch of the Space Shuttle Endeavour, to get STS-118 underway, from the Launch Control Center on August 8, 2007 at the Kennedy Space Center in Cape Canaveral, Fla. The shuttle lifted off from launch pad 39A at 6:36 p.m. (EDT). Behind and to the right of Administrator Griffin is William Gerstenmaier, NASA Associate Administrator for Space Operations.
Credit: NASA/Bill Ingalls
Image Number: JSC2007-E-41601
Date: August 8, 2007
Griffin and Gerstenmaier at STS-118 Launch
NASA Administrator Michael Griffin (foreground) watches the launch of the Space Shuttle Endeavour, to get STS-118 underway, from the Launch Control Center on August 8, 2007 at the Kennedy Space Center in Cape Canaveral, Fla. The shuttle lifted off from launch pad 39A at 6:36 p.m. (EDT). Behind and to the right of Administrator Griffin is William Gerstenmaier, NASA Associate Administrator for Space Operations.
Credit: NASA/Bill Ingalls
Image Number: JSC2007-E-41601
Date: August 8, 2007