Full Scale Tunnel (FST)
Description Installation of Careystone covering at the Full-Scale Tunnel (FST) facility. The corrugated concrete and asbestos panels (1/4 inch thick; 42 inches wide; 62 inches long) which were used as siding and roofing for the Full-Scale Tunnel were manufactured by The Philip Carey Company. For the NACA, the choice of Careystone had been based on several factors. First and foremost was its low cost. NACA engineers had observed the very durable, low-maintenance and fireproof qualities of the concrete-asbestos covering of the airship hanger at Langley Field. Further, tests showed the material to be 3.8 times stronger than required (The maximum load the material was expected to withstand was 52 lbs. per square foot; the breaking load was 196 lbs. per sq. ft.).
Credit: NASA
Image Number: L-4693
Date: August 15, 1930
Full Scale Tunnel (FST)
Description Installation of Careystone covering at the Full-Scale Tunnel (FST) facility. The corrugated concrete and asbestos panels (1/4 inch thick; 42 inches wide; 62 inches long) which were used as siding and roofing for the Full-Scale Tunnel were manufactured by The Philip Carey Company. For the NACA, the choice of Careystone had been based on several factors. First and foremost was its low cost. NACA engineers had observed the very durable, low-maintenance and fireproof qualities of the concrete-asbestos covering of the airship hanger at Langley Field. Further, tests showed the material to be 3.8 times stronger than required (The maximum load the material was expected to withstand was 52 lbs. per square foot; the breaking load was 196 lbs. per sq. ft.).
Credit: NASA
Image Number: L-4693
Date: August 15, 1930