20-Inch Mach 6 CF4 Tunnel
(1973-L-06173): This is the original configuration of the 20-Inch Mach 6 CF4 Tunnel in Building 1275. Note the control valve on the inlet pipe’s tee in the center of this view and the pair of lead-bath heaters at right.
Credit: NASA
Image Number: 1973-L-06173
Date: July 23, 1973
16,794
views
1
fave
0
comments
Uploaded on August 5, 2013
Taken on July 23, 1973
20-Inch Mach 6 CF4 Tunnel
(1973-L-06173): This is the original configuration of the 20-Inch Mach 6 CF4 Tunnel in Building 1275. Note the control valve on the inlet pipe’s tee in the center of this view and the pair of lead-bath heaters at right.
Credit: NASA
Image Number: 1973-L-06173
Date: July 23, 1973
16,794
views
1
fave
0
comments
Uploaded on August 5, 2013
Taken on July 23, 1973