Back to album

STS-70 Rollout

The Crawler Transporter brings the Space Shuttle Discovery on its Mobile Launcher Platform into position at Launch Pad 39B, following rollout from the Vehicle Assembly Building. The Fixed Service Structure and the Rotating Service Structure, permanent parts of the launch pad, are left of the Shuttle. Discovery and its crew of five lifted off on July 13, 1995, on a satellite deployment mission, STS-70. Meanwhile, sister ship Atlantis was poised for launch from Pad 39A on a mission to rendezvous and dock with the Russian Mir Space Station. Atlantis lifted off on STS-71 on June 27, 1995.

 

NASA Media Usage Guidelines

 

Credit: NASA

Image Number: 95PC-0668

Date: May 11, 1995

88,781 views
93 faves
0 comments
Uploaded on May 11, 2025
Taken on May 11, 1995