Access Project Management Achieving Competitive Advantage 3rd Edition Pinto Solutions Manual All Chapters Immediate PDF Download

The document provides links to various test banks and solutions manuals for project management and other subjects, emphasizing the availability of study materials. It includes a chapter outline on risk management, detailing a four-stage process for managing project risks, along with case studies and discussion questions. Additionally, it covers qualitative and quantitative risk assessment tools and their benefits and drawbacks.

Uploaded by

ndiefialouli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (29 votes)
78 views

Access Project Management Achieving Competitive Advantage 3rd Edition Pinto Solutions Manual All Chapters Immediate PDF Download

The document provides links to various test banks and solutions manuals for project management and other subjects, emphasizing the availability of study materials. It includes a chapter outline on risk management, detailing a four-stage process for managing project risks, along with case studies and discussion questions. Additionally, it covers qualitative and quantitative risk assessment tools and their benefits and drawbacks.

Uploaded by

ndiefialouli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 48

Full Download Test Bank Get the Latest Study Materials at testbankfan.

com

Project Management Achieving Competitive Advantage


3rd Edition Pinto Solutions Manual

https://testbankfan.com/product/project-management-
achieving-competitive-advantage-3rd-edition-pinto-solutions-
manual/

OR CLICK HERE

DOWLOAD NOW

Download More Test Banks for All Subjects at https://testbankfan.com


Recommended digital products (PDF, EPUB, MOBI) that
you can download immediately if you are interested.

Project Management Achieving Competitive Advantage 3rd


Edition Pinto Test Bank

https://testbankfan.com/product/project-management-achieving-
competitive-advantage-3rd-edition-pinto-test-bank/

testbankfan.com

Project Management Achieving Competitive Advantage 4th


Edition Pinto Solutions Manual

https://testbankfan.com/product/project-management-achieving-
competitive-advantage-4th-edition-pinto-solutions-manual/

testbankfan.com

Project Management Achieving Competitive Advantage 4th


Edition Pinto Test Bank

https://testbankfan.com/product/project-management-achieving-
competitive-advantage-4th-edition-pinto-test-bank/

testbankfan.com

Discovering Statistics Using IBM SPSS Statistics 5th


Edition Field Test Bank

https://testbankfan.com/product/discovering-statistics-using-ibm-spss-
statistics-5th-edition-field-test-bank/

testbankfan.com
Psychology Core Concepts 8th Edition Zimbardo Solutions
Manual

https://testbankfan.com/product/psychology-core-concepts-8th-edition-
zimbardo-solutions-manual/

testbankfan.com

Single Variable Calculus Early Transcendentals 7th Edition


Stewart Test Bank

https://testbankfan.com/product/single-variable-calculus-early-
transcendentals-7th-edition-stewart-test-bank/

testbankfan.com

Chemistry The Central Science 12th Edition Brown Test Bank

https://testbankfan.com/product/chemistry-the-central-science-12th-
edition-brown-test-bank/

testbankfan.com

Drug Use and Abuse 7th Edition Maisto Test Bank

https://testbankfan.com/product/drug-use-and-abuse-7th-edition-maisto-
test-bank/

testbankfan.com

Hotel Management and Operations 5th Edition OFallon Test


Bank

https://testbankfan.com/product/hotel-management-and-operations-5th-
edition-ofallon-test-bank/

testbankfan.com
Concepts Of Database Management 7th Edition Pratt
Solutions Manual

https://testbankfan.com/product/concepts-of-database-management-7th-
edition-pratt-solutions-manual/

testbankfan.com
07-01

CHAPTER SEVEN

Risk Management
Chapter Outline

PROJECT PROFILE

Haitian Earthquake Relief

INTRODUCTION

PROJECT MANAGERS IN PRACTICE

Mohammed Al-Sadiq, Saudi Aramco Oil Company

7.1 RISK MANAGEMENT: A FOUR-STAGE PROCESS

Risk Identification

Analysis of Probability and Consequences

Risk Mitigation Strategies

Use of Contingency Reserves

Other Mitigation Strategies

Control and Documentation

PROJECT PROFILE

Collapse of Shanghai Apartment Building

7.2 PROJECT RISK MANAGEMENT: AN INTEGRATED APPROACH

Summary

Key Terms

Solved Problems

Discussion Questions
07-02

Problems

Case Study 7.1 Classic Case: de Havilland’s Falling Comet

Case Study 7.2 Classic Case: Tacoma Narrows Suspension Bridge

Internet Exercises

PMP Certification Sample Questions

Integrated Project—Project Risk Assessment

Notes
07-03

TRANSPARENCIES

7.1 RISK VERSUS AMOUNT AT STAKE


07-04

7.2 TYPICAL RISK FACTORS

1. FINANCIAL RISKS

2. TECHNICAL RISKS

3. COMMERCIAL RISKS

4. EXECUTION RISKS

5. CONTRACTUAL OR LEGAL RISKS


07-05

7.3 QUALITATIVE RISK ASSESSMENT MATRIX


07-06

7.4 QUANTITATIVE RISK ASSESSMENT


CALCULATIONS
07-07

7.4 QUANTITATIVE RISK ASSESSMENT


CALCULATIONS (CON’D)
07-08

7.4 QUANTITATIVE RISK ASSESSMENT


CALCULATIONS (CON’D)
07-09

7.5 CONTINGENCY DOCUMENT FOR ADJUSTMENTS


TO PROJECT PLAN

Probable
Event ADJUSTMENT TO PLANS

Absenteesim

Resignation

Pull-aways

Unavailable
Staff/skills

Spec Change

Added work

Need more
training

Vendors late
07-10

DISCUSSION QUESTIONS

1. Do you agree with the following statement: “With proper planning it is possible to
eliminate most/all risks from a project.” Why or why not?

It is not possible to eliminate risk from a project regardless of planning. The role of risk
management is to identify and analyze potential risks associated with a project. Once
risks have been identified, preventative action or contingency plans may be established to
reduce the impact of the risk on the success of the project. While this presents a way to
help control the effects of risk, it does not eliminate risk from the project management
equation.

2. In evaluating projects across industries, it is sometimes possible to detect patterns


in terms of the more common types of risks they routinely face. Consider the
development of a new software product and compare it to coordinating an event,
such as a school dance. What likely forms of risk would your project team face in
either of these circumstances?

A new software product would include a higher amount of risk than a school dance. The
software project would be subject to risk related to market volume/price, technical risk,
financing, scheduling, resignation, organizational, and operating risk. Coordinating a
school dance would run risks associated with availability of staff and an appropriate
facility as well as adequate funding. Both projects would involve risk variables such as
cost estimate risk, integration risk, “acts of God”, inadequate skills availability, and
absenteeism.

3. Analyze Figure 7.2 (degree of risk over the project life cycle). What is the
practical significance of this model? What implications does it suggest for
managing risk?
07-11

The diagram demonstrates the relationship between level of opportunity and risk
throughout the project life cycle. This is helpful in determining points at which
uncertainty is at its highest and when the greatest amount of risk may be realized. Project
teams can focus their risk analysis in these areas or use the diagram to give weight or
perspective to potential risk variables. The diagram also depicts the risk-reward
(opportunity) tradeoff for various stages of a project. Managers can use this information
to determine if risk at a certain point is worth the potential payoffs.

4. What are the benefits and drawbacks of using the various forms of risk
identification mentioned in the chapter (e.g., brainstorming meetings, expert
opinion, etc.)?

Brainstorming, expert opinion and multiple assessment approaches share similar benefits
and drawbacks. The benefits include a variety of experience and multiple angles of
analysis due to different points of view and areas of expertise. Synergy among group
members may also create a wider range of risk identification. Although there are
shortcomings to these approaches. It may be difficult to come to an agreement or
consensus in such processes due to conflicting opinions and personal issues.
Brainstorming, expert opinion (when performed in a forum setting rather than through the
Delphi approach) and multiple assessments may also have difficulty reaching consensus
due to egos/authority issues and functional biases (when members of different
departments are present). When the Delphi technique is employed many of these issues
are resolved because members do not meet face-to-face. The process becomes
anonymous reducing interference of egos and personal problems. However, the Delphi
approach can take considerable time to complete successfully.

Past history is a unique approach to the other three. It uses historical facts to reach
conclusions, which removes many obstacles that the other techniques encounter. The
benefits of risk identification through past history is that, if past projects were well
07-12

documented, information related to similar projects can easily be found and project teams
can avoid pitfalls by learning from the mistakes of others. Unfortunately, the drawback is
that past performance does not always predict future performance. Project-specific data
(i.e. competitive environment, economy, etc.) is unaccounted for. Thus, past history may
do little to forecast present risks.

5. What are the benefits and drawbacks of using a qualitative risk assessment matrix
for classifying the various types of project risk?

Qualitative risk assessment matrix is beneficial in providing a visual depiction of


potential risk factors. The matrix enables the project team to prioritize risk based on
severity of consequences and likelihood of occurrence. For instance, those that rest in the
“high” portion of both consequences and likelihood would be top priorities during project
planning. Drawbacks of the matrix may revolve around differences in opinion as to
where risk variables should be placed on the matrix. It may also create tunnel vision
where the team fails to acknowledge the significance of tasks that fall outside of the high
priority areas.

6. What are the benefits and drawbacks of using a quantitative risk assessment tool
such as the one shown in the chapter?

One benefit of such tools is in the ability to set thresholds based on calculations of
probability and consequence. A numerical point system creates an easy way to compare
different risk variables. This point system also provides more detail than a matrix in
depicting the level of risk. Additionally, once the point system is designed it can be used
over and over to compare risk factors of future projects. Problems with these tools may
arise in disagreement over assigning points and creating thresholds. Also, the point
system is not an exact science. It relies on rules of thumb and may be subject to
interpretation.
07-13

7. Give some examples of projects using each of the risk mitigation strategies
(accept, minimize, share, or transfer). How successful were these strategies? In
hindsight, would another approach have been better?

This question requires students to do some online research, investigating projects and
analyzing them in terms of various risk mitigation approaches. One suggestion is to
assign a specific project, such as the new Airbus A-380 and have the students research it,
address relevant risks factors, and the mitigation strategies the company employed.

8. Explain the difference between managerial contingency and task contingency?

Contingency reserves are provisions set aside in case of unforeseen problems. The
primary differences between task and managerial contingency are that managerial
contingency is applied at the project level while task contingency is applied at the
individual task or work package level. Managerial contingencies are budgeting buffers
that teams can fall back on in case of natural disasters, severe divergence from original
process or technical plans or other “acts of God.” Task contingencies are established
because estimates (made during initial planning) for individual tasks may be unreliable.
Reserves for these contingencies may be adjusted as the project advances and estimates
become more accurate.

9. What are the advantages of developing and using a systematic risk management
approach, such as PRAMs methodology? Do you perceive any disadvantages
with this approach?

PRAMs and other similar systems are advantageous because they provide a detailed step-
by-step approach to risk management. This helps project teams work through each part
07-14

of risk management effectively before moving on to subsequent tasks. This way the team
does not get stalled at one stage or leave out a vital step altogether. PRAMs adds an
additional feature – the feedback loop – that acts as a built-in safeguard to overlooking
risk associated with project changes. The loop also keeps varying levels of managers and
team members up-to-date on project and risk adjustments. The disadvantage to the
PRAMs model is that it may be too involved for low-budget or otherwise small projects.
The amount of time required to learn and institute the steps may be unreasonable in a
short-term, low-budget initiative. Also, it may not be feasible for smaller companies who
do not have the resources or time to devote to such a system.

10. Consider the following statement: “The problem with risk analysis is that it is
possible to imagine virtually anything going wrong on a project. Where do you draw
the line; in other words, how far do you take risk analysis before it becomes
overkill?” How would you respond to this observation?

The tools in this chapter address this very problem. Looking for possible risks could be
an endless process, however, it is important (as outlined in the text) to approach risk in a
systematic way. The early stages of risk management may best answer this question.
The prioritization of risks makes the process manageable, and when done properly, will
prevent a situation of overkill. After potential risks have been identified (using a
supervised, controlled method such as brainstorming, expert opinion, etc.), managers can
use qualitative and quantitative tools to sift through scores of risks to identify what is
probable enough to worry about. Once vital risk variables have been identified, then
mitigation and contingencies can be established. This process does not ensure that all
risks will be identified or that the right contingencies will be created. All the same, the
benefits of taking part in risk management far outweigh the danger of not preparing for
potential problems.
07-15

CASE STUDIES

Case Study 7.1: de Havilland’s Falling Comet

The de Havilland story is a fascinating example of a well-respected organization that


sought to be first to market with a radical new technology and cut some important safety
corners, with disastrous results. The story highlights the problems when innovations in
design are pushed too far, too quickly. With its unique design and all the additional
features that made it radical, the Comet should have been slowly integrated into
production and use, instead of being rushed to market. De Havilland knew that Boeing
was at work on its own design, the 707, and felt the need to be first to market. In this
rush, they cut a number of safety corners with disastrous results.

Questions:

1) How could risk management have aided in the development of the Comet?

De Havilland was producing an aircraft that was so revolutionary in so many ways that
they may have become overawed by the push in technology for its own sake. Certainly,
the original Comet included several radical design elements (embedded engines in the
wing root, square windows, pressurized cabin, and so forth) that any one of them could
have been a significant advance on its own. Putting them all together into the same new
aircraft design without adequate testing was a disaster. The question of how much testing
is enough is difficult to answer but certainly, with so many innovations in one design, it is
clear that they did not engage in sufficient risk assessment and design testing.

2) Discuss the various types of risk (technical, financial, commercial, etc.) in relation
to the Comet. Develop a qualitative risk matrix for these risk factors and assess
them in terms of probability and consequences.
07-16

This question asks students to identify the wide variety of risks that were present in this
aircraft. Commercially, de Havilland had a huge investment in its success and perceived
that first-mover advantage would allow them to pick up a big piece of the commercial jet
aircraft market if they were first off the mark. Technically, the aircraft had so many new
and radical features that several of them could have been perceived as risky in their own
right. All of them together were simply too much risk, too fast. Although in might be
difficult for students to reasonably comment on probability of failure, there is no question
that consequences would be catastrophic (as they were).

3) Given that a modified version of the Comet (the Comet IV) is still in use with the
British Government as an anti-submarine warfare aircraft, it is clear that the
design flaws could have been corrected given enough time. What, then, do you
see as de Havilland’s critical error in the development of the Comet?

Over time, the fundamental aircraft design (minus the original square windows) has been
proven to be a success, though the company never again attempted to launch it in the
commercial jet market. De Havilland tried to do too much too fast and created an unsafe
design due to inadequate testing. Students are quick to recognize this basic error on de
Havilland’s part. It is often instructive to note that this foray into the commercial jet
aircraft market was de Havilland’s last and they never returned to the level of technical or
commercial success they had enjoyed during and just after the Second World War.

4) Comment on the statement: “Failure is the price we pay for technological


advancement.”

This question can generate several opinions from students as evidence demonstrates
again and again that organizations continue to push the edges of the technological
envelope with new designs for buildings, aircraft, automobiles, etc. The issue that we
have to address is just how far one should be allowed to push this envelope and at what
point does some system of controls come into play. Clearly, the greater the consequences
07-17

of failure, the greater the oversight needed to ensure that sufficient risk analysis and
management has taken place prior to opening Pandora’s Box.

Case Study 7.2: Tacoma Narrows Bridge

The famous story of the bridge that shook itself to pieces is familiar to many students.
The background of the story is not as well-known and illustrates what happens when we
attempt to be too innovative without recognizing the full implications of our choices.
The Tacoma Narrows Bridge (TNB) was built at a sight with numerous design challenges
and difficulties, including physical location, size and length of the bridge, use of non-
optimal materials, and so forth. From a risk analysis perspective, the TNB represents
another example of journeying too far into the unknown and only belatedly recognizing
the implications of major design decisions.

Questions:

1) In what ways was the project’s planning and scope management appropriate and
when did they begin taking unknowing or unnecessary risks? Discuss the issue of
project constraints and other unique aspects of the bridge in the risk management
process. Did they take them sufficiently into consideration? Why or why not?

It is easy, in hindsight, for students to criticize several elements in the TNB development
and construction; however, it is important that instructors not allow them to take the easy
way out and focus on the result of the construction. Rather, it is useful to examine how
the development of this bridge actually led to the understanding of an entirely new field
of engineering – aerodynamics. It was thought, up to that point, that bridge-building was
simply a static engineering problem, concerned with downward loads. It took this failure
for engineers and scientists to understand the implications of entirely new forces. In
developing the answers to this question, it is useful to consider all the constraints (known
07-18

and discovered) that they were dealing with at the sight and with the design they had. In
those circumstances, ask student what they did correctly and where they ignored ample
warning signs of problems to come.

2) Conduct either a qualitative or quantitative risk assessment on this project.


Identify the risk factors that you consider most important for the suspension
bridge construction. How would you assess the riskiness of this project? Why?

This exercise allows faculty to tease out the various risk factors that the TNB project
encountered. After listing them on the board develop a qualitative risk matrix and ask
students to help classify the various risk elements. Ask the question: Why was so little
risk analysis done at the time? The answer is that they did not recognize the risk in the
design, sighting of the bridge, or construction until after it had been constructed.

3) What forms of risk mitigation would you consider appropriate for this project?

Instructors can discuss various risk mitigation strategies in light of the TNB example
(share it, transfer it, etc.). It is useful to ask how each mitigation strategy might be used,
who it would be used with (which stakeholder parties), and how effective each strategy
might be.
07-19

PROBLEMS

1. Assessing Risk Factors. Consider the planned construction of a new office building
in downtown Houston at a time when office space is in surplus demand (more office
space than users). Construct a risk analysis that examines the various forms of risk
(technical, commercial, financial, etc.) related to the creation of this office building.
How would your analysis change if office space was in high demand?

Solution:

This question can be answered by students in a number of ways. The key point is to get
them thinking in terms of potential risks that are bound to exist prior to initiating a new
project. Commercial risk is paramount here because office space is in low demand,
making any new office building project questionable from a financial perspective.

2. Qualitative Risk Assessment. Imagine that you are a member of a project team that
has been charged to develop a new product for the residential building industry. Using a
qualitative risk analysis matrix, develop a risk assessment for a project based on the
following information:

Identified risk factors Likelihood

1. Key team members pulled off project 1. High


2. Chance of economic downturn 2. Low
3. Project funding cut 3. Medium
4. Project scope changes 4. High
5. Poor spec. performance 5. Low
07-20

Based on the above information, how would you rate the consequences of each of the
identified risk factors? Why? Construct the risk matrix and classify each of the risk
factors in the matrix.

Solution:

Student can draw a simple 3x3 risk matrix with Probability and Consequences as the two
axes. Depending upon how they view the consequences of each of the above risks, it is
possible to classify them into one of the quadrants of the qualitative risk matrix. The key
is that students justify their classification by giving a logical reason for the consequences
they perceive for each risk factor, should the problem actually occur.

3. Developing Risk Mitigation Strategies. Develop a preliminary risk mitigation


strategy for each of the risk factors identified in problem 2 above. If you were to
prioritize your efforts, which risk factors would you address first? Why?

Solution:

Students can construct a risk mitigation approach (accept it, transfer it, etc.) for each of
the risk factors identified. They must justify their mitigation strategy on the basis of how
severe the risk effect could be, the alternatives, and the reasons why they selected the
mitigation strategy they chose.

4. Quantitative Risk Assessment. Assume the following information:

Probability of Failure Consequences of Failure

Maturity = .3 Cost = .1
Complexity = .3 Schedule = .7
Dependency = .5 Performance = .5
07-21

Please calculate the Overall risk factor for this project. Would you assess this level of
risk as low, moderate, or high? Why?

Solution:

Using the formula from the chapter, the solution to this problem is:

Pf = (.3 + .3 + .5)/3 = .37


Cf = (.1 + .7 + .5)/3 = .43

Risk Factor = .37 + .43 – (.37 x .43) = .6409, or .64


According to the severity levels, this would be classified as medium risk.

5. Developing Risk Mitigation Strategies. Assume that you are a project team
member for a highly complex project, based on a new technology that has never been
directly proven in the marketplace. Further, you require the services of a number of sub-
contractors to complete the design and development of this project. Because you are
facing severe penalties in the event the project is late to market, your boss has asked you
and your project team to develop risk mitigation strategies to minimize your company’s
exposure on this project. Discuss the various types of risk that you are likely to
encounter. How should your company deal with them (accept them, share them, transfer
them, or minimize them)? Justify your answers.

Solution:

This question is not intended to elicit a specific answer, but to make students consider all
potential issues that could arise and begin to formulate strategies for mitigating those
risks. The more interesting discussion typically emerge around the question of which
mitigation strategies are best for different risks. Some creative thinking of the part of
07-22

students can often identify alternatives to standard approaches for risk mitigation,
although it is also useful to have them recognize that for certain low impact risks, simply
accepting them is often the best (least expensive and fastest) solution.

6. Assessing Risk and Benefits. Suppose you are a member of a project team that is
evaluating the bids of potential contractors for developing some sub-assemblies for your
project. Your boss makes it clear that any successful bid must demonstrate a balance
between risk and price. Explain how this is so; specifically, why are price and risk seen
as equally important but opposite issues in determining the winner of the contract? Is a
low price/high risk bid acceptable? Is a high price/low risk bid acceptable? Why or why
not?

Solution:

The issue of price and risk and critical for understanding the thought process that often
goes on with clients when deciding which contractor to award the project. At times, a
higher price bid can win a contract, provided that the client recognizes a lower risk level
with a certain contractor. For example, in cases where an older, well established firm
bids a contract, they may offer a higher bid but it is attractive because their obvious
project management expertise lower concomitant risk. On the other hand, an untested or
problematic contractor’s low bid may be refused because they bring unacceptable levels
of risk to the project. Price and risk thus serve as the weights on two opposite scale pans.
Too much risk requires exceptionally lower prices, whereas a higher bid can be offset
with significant reductions in risk.
Other documents randomly have
different content
with active links or immediate access to the full terms of the Project
Gutenberg™ License.

1.E.6. You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form,
including any word processing or hypertext form. However, if you
provide access to or distribute copies of a Project Gutenberg™ work
in a format other than “Plain Vanilla ASCII” or other format used in
the official version posted on the official Project Gutenberg™ website
(www.gutenberg.org), you must, at no additional cost, fee or
expense to the user, provide a copy, a means of exporting a copy, or
a means of obtaining a copy upon request, of the work in its original
“Plain Vanilla ASCII” or other form. Any alternate format must
include the full Project Gutenberg™ License as specified in
paragraph 1.E.1.

1.E.7. Do not charge a fee for access to, viewing, displaying,


performing, copying or distributing any Project Gutenberg™ works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8. You may charge a reasonable fee for copies of or providing


access to or distributing Project Gutenberg™ electronic works
provided that:

• You pay a royalty fee of 20% of the gross profits you derive
from the use of Project Gutenberg™ works calculated using the
method you already use to calculate your applicable taxes. The
fee is owed to the owner of the Project Gutenberg™ trademark,
but he has agreed to donate royalties under this paragraph to
the Project Gutenberg Literary Archive Foundation. Royalty
payments must be paid within 60 days following each date on
which you prepare (or are legally required to prepare) your
periodic tax returns. Royalty payments should be clearly marked
as such and sent to the Project Gutenberg Literary Archive
Foundation at the address specified in Section 4, “Information
about donations to the Project Gutenberg Literary Archive
Foundation.”

• You provide a full refund of any money paid by a user who


notifies you in writing (or by e-mail) within 30 days of receipt
that s/he does not agree to the terms of the full Project
Gutenberg™ License. You must require such a user to return or
destroy all copies of the works possessed in a physical medium
and discontinue all use of and all access to other copies of
Project Gutenberg™ works.

• You provide, in accordance with paragraph 1.F.3, a full refund of


any money paid for a work or a replacement copy, if a defect in
the electronic work is discovered and reported to you within 90
days of receipt of the work.

• You comply with all other terms of this agreement for free
distribution of Project Gutenberg™ works.

1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™


electronic work or group of works on different terms than are set
forth in this agreement, you must obtain permission in writing from
the Project Gutenberg Literary Archive Foundation, the manager of
the Project Gutenberg™ trademark. Contact the Foundation as set
forth in Section 3 below.

1.F.

1.F.1. Project Gutenberg volunteers and employees expend


considerable effort to identify, do copyright research on, transcribe
and proofread works not protected by U.S. copyright law in creating
the Project Gutenberg™ collection. Despite these efforts, Project
Gutenberg™ electronic works, and the medium on which they may
be stored, may contain “Defects,” such as, but not limited to,
incomplete, inaccurate or corrupt data, transcription errors, a
copyright or other intellectual property infringement, a defective or
damaged disk or other medium, a computer virus, or computer
codes that damage or cannot be read by your equipment.

1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for


the “Right of Replacement or Refund” described in paragraph 1.F.3,
the Project Gutenberg Literary Archive Foundation, the owner of the
Project Gutenberg™ trademark, and any other party distributing a
Project Gutenberg™ electronic work under this agreement, disclaim
all liability to you for damages, costs and expenses, including legal
fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR
NEGLIGENCE, STRICT LIABILITY, BREACH OF WARRANTY OR
BREACH OF CONTRACT EXCEPT THOSE PROVIDED IN PARAGRAPH
1.F.3. YOU AGREE THAT THE FOUNDATION, THE TRADEMARK
OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL
NOT BE LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES EVEN IF
YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH DAMAGE.

1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you


discover a defect in this electronic work within 90 days of receiving
it, you can receive a refund of the money (if any) you paid for it by
sending a written explanation to the person you received the work
from. If you received the work on a physical medium, you must
return the medium with your written explanation. The person or
entity that provided you with the defective work may elect to provide
a replacement copy in lieu of a refund. If you received the work
electronically, the person or entity providing it to you may choose to
give you a second opportunity to receive the work electronically in
lieu of a refund. If the second copy is also defective, you may
demand a refund in writing without further opportunities to fix the
problem.

1.F.4. Except for the limited right of replacement or refund set forth
in paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO
OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.

1.F.5. Some states do not allow disclaimers of certain implied


warranties or the exclusion or limitation of certain types of damages.
If any disclaimer or limitation set forth in this agreement violates the
law of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted
by the applicable state law. The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation,


the trademark owner, any agent or employee of the Foundation,
anyone providing copies of Project Gutenberg™ electronic works in
accordance with this agreement, and any volunteers associated with
the production, promotion and distribution of Project Gutenberg™
electronic works, harmless from all liability, costs and expenses,
including legal fees, that arise directly or indirectly from any of the
following which you do or cause to occur: (a) distribution of this or
any Project Gutenberg™ work, (b) alteration, modification, or
additions or deletions to any Project Gutenberg™ work, and (c) any
Defect you cause.

Section 2. Information about the Mission


of Project Gutenberg™
Project Gutenberg™ is synonymous with the free distribution of
electronic works in formats readable by the widest variety of
computers including obsolete, old, middle-aged and new computers.
It exists because of the efforts of hundreds of volunteers and
donations from people in all walks of life.

Volunteers and financial support to provide volunteers with the


assistance they need are critical to reaching Project Gutenberg™’s
goals and ensuring that the Project Gutenberg™ collection will
remain freely available for generations to come. In 2001, the Project
Gutenberg Literary Archive Foundation was created to provide a
secure and permanent future for Project Gutenberg™ and future
generations. To learn more about the Project Gutenberg Literary
Archive Foundation and how your efforts and donations can help,
see Sections 3 and 4 and the Foundation information page at
www.gutenberg.org.

Section 3. Information about the Project


Gutenberg Literary Archive Foundation
The Project Gutenberg Literary Archive Foundation is a non-profit
501(c)(3) educational corporation organized under the laws of the
state of Mississippi and granted tax exempt status by the Internal
Revenue Service. The Foundation’s EIN or federal tax identification
number is 64-6221541. Contributions to the Project Gutenberg
Literary Archive Foundation are tax deductible to the full extent
permitted by U.S. federal laws and your state’s laws.

The Foundation’s business office is located at 809 North 1500 West,


Salt Lake City, UT 84116, (801) 596-1887. Email contact links and up
to date contact information can be found at the Foundation’s website
and official page at www.gutenberg.org/contact

Section 4. Information about Donations to


the Project Gutenberg Literary Archive
Foundation
Project Gutenberg™ depends upon and cannot survive without
widespread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can
be freely distributed in machine-readable form accessible by the
widest array of equipment including outdated equipment. Many
small donations ($1 to $5,000) are particularly important to
maintaining tax exempt status with the IRS.

The Foundation is committed to complying with the laws regulating


charities and charitable donations in all 50 states of the United
States. Compliance requirements are not uniform and it takes a
considerable effort, much paperwork and many fees to meet and
keep up with these requirements. We do not solicit donations in
locations where we have not received written confirmation of
compliance. To SEND DONATIONS or determine the status of
compliance for any particular state visit www.gutenberg.org/donate.

While we cannot and do not solicit contributions from states where


we have not met the solicitation requirements, we know of no
prohibition against accepting unsolicited donations from donors in
such states who approach us with offers to donate.

International donations are gratefully accepted, but we cannot make


any statements concerning tax treatment of donations received from
outside the United States. U.S. laws alone swamp our small staff.

Please check the Project Gutenberg web pages for current donation
methods and addresses. Donations are accepted in a number of
other ways including checks, online payments and credit card
donations. To donate, please visit: www.gutenberg.org/donate.

Section 5. General Information About


Project Gutenberg™ electronic works
Professor Michael S. Hart was the originator of the Project
Gutenberg™ concept of a library of electronic works that could be
freely shared with anyone. For forty years, he produced and
distributed Project Gutenberg™ eBooks with only a loose network of
volunteer support.
Project Gutenberg™ eBooks are often created from several printed
editions, all of which are confirmed as not protected by copyright in
the U.S. unless a copyright notice is included. Thus, we do not
necessarily keep eBooks in compliance with any particular paper
edition.

Most people start at our website which has the main PG search
facility: www.gutenberg.org.

This website includes information about Project Gutenberg™,


including how to make donations to the Project Gutenberg Literary
Archive Foundation, how to help produce our new eBooks, and how
to subscribe to our email newsletter to hear about new eBooks.
back
back
back
back
back
back
back
back
back
back
back
back

You might also like