Skip to content
Permalink

Comparing changes

Choose two branches to see what’s changed or to start a new pull request. If you need to, you can also or learn more about diff comparisons.

Open a pull request

Create a new pull request by comparing changes across two branches. If you need to, you can also . Learn more about diff comparisons here.
base repository: mudbugmedia/critical-path-css-rails
Failed to load repositories. Confirm that selected base ref is valid, then try again.
Loading
base: 909dfc5
Choose a base ref
...
head repository: ProGM/critical-path-css-rails
Failed to load repositories. Confirm that selected head ref is valid, then try again.
Loading
compare: 5b83d3a
Choose a head ref
  • 2 commits
  • 1 file changed
  • 1 contributor

Commits on Apr 18, 2016

  1. Configuration menu
    Copy the full SHA
    efc4be5 View commit details
    Browse the repository at this point in the history
  2. Configuration menu
    Copy the full SHA
    5b83d3a View commit details
    Browse the repository at this point in the history
Loading