Skip to content
Permalink

Comparing changes

Choose two branches to see what’s changed or to start a new pull request. If you need to, you can also or learn more about diff comparisons.

Open a pull request

Create a new pull request by comparing changes across two branches. If you need to, you can also . Learn more about diff comparisons here.
base repository: mudbugmedia/critical-path-css-rails
Failed to load repositories. Confirm that selected base ref is valid, then try again.
Loading
base: v4.1.0
Choose a base ref
...
head repository: mudbugmedia/critical-path-css-rails
Failed to load repositories. Confirm that selected head ref is valid, then try again.
Loading
compare: master
Choose a head ref
  • 3 commits
  • 2 files changed
  • 2 contributors

Commits on Aug 25, 2020

  1. 1 Configuration menu
    Copy the full SHA
    5ceff9d View commit details
    Browse the repository at this point in the history

Commits on Aug 27, 2020

  1. Merge pull request #54 from shinnyx/bugfix/invalid-route

    Return first css path when route index is nil
    michael-misshore authored Aug 27, 2020
    Configuration menu
    Copy the full SHA
    f7c5089 View commit details
    Browse the repository at this point in the history

Commits on Dec 23, 2020

  1. Update Version

    michael-misshore committed Dec 23, 2020
    Configuration menu
    Copy the full SHA
    909dfc5 View commit details
    Browse the repository at this point in the history
Loading