Melc 2022 - CSS7
Melc 2022 - CSS7
LESSON 4:
PREPARING
AND
INTERPRET
ING
TECHNICAL
DRAWING
(PITD)
The learners The learners LO 1. Identify different 1
demonstrate shall be able to kinds of technical Week
and prepare and drawings
understanding interpret 1.1 Select correct technical
of technical drawing in
concepts and
underlying
principles in
accordance with the job
preparing
requirement
and
drawings and 1.2 Segregate technical
interpreting
work plans drawings in
technical
accurately accordance with the types
drawings and
and kinds of
work plans for
drawings
computer
systems
servicing
LO 2. Interpret technical
drawing
2.1 Recognize components,
assemblies, or
objects as required
2.2 Identify dimensions of
the key
features of the objects
depicted in the TLE_IACS
drawing S9-
12PITD-
2.3 Identify and interpret
IIg-h-
symbols used in
14
the drawing
2.4 Check and validate
drawing against job
requirements or
equipment in
accordance with standard
operating
procedures
LO 3. Prepare/ make
changes to
electrical/ electronic
schematics and
drawings TLE_IACS
3.1 Draw and identify S9-
correctly electrical/ 12PITD-
electronic schematic IIh-i-
3.2 Identify correct 15
drawing; select and
use equipment in
accordance with job
requirements
LO 4. Store technical TLE_IACS
drawings and S9-
equipment/ instruments 12PITD-
4.1 Identify tasks to be
undertaken for
care and maintenance of
drawings
according to company
procedures
4.2 Record technical
drawings and
prepare an inventory in IIj-16
accordance
with company procedures
4.3 4.3 identify tasks to be
undertaken for
proper storage of
instruments
according to company
procedures
LESSON 5:
TERMINATI
NG AND
CONNECTIN
G
ELECTRICA
L WIRING
AND
ELECTRONI
CS CIRCUIT
(TCEW)
0 The learners The learner LO 1. Plan and prepare 1 TLE_IACS
demonstrate shall be able to for termination/ Week S9-
an demonstrate connection of electrical 12TCEW-
understanding proper wiring/ IIIe
of termination electronics circuits f-21
concepts and and 1.1 Check materials
underlying connection of according to
principles in electrical specifications and tasks
terminating wiring 1.2 Select appropriate
and and electronics tools and
connecting circuits equipment according to
electrical task
wiring and requirements
electronics 1.3 Follow planned task to
circuits ensure OHS
guidelines and procedure
1.4 Prepare electrical
wiring/electronics
circuits correctly for
connecting/terminating in
accordance
with instruction and work
site
procedures
LO 2: Terminate/connect
electrical
wiring/ electronic circuits
2.1 Observe safety
procedures in using
tools and use appropriate
personal
protective equipment at all
times
2.2 Identify the tasks to be
undertaken to
work safely in accordance
with the TLE_IACS
workplace and standard S9-
procedures 12TCEW-
2.3 Use appropriate range IIIg
of methods in i-22
termination/connection in
accordance
to specifications,
manufacturer’s
requirements, and safety
2.4 Follow correct
sequence of operation
2.5 Adjust used accessories
2.6 Confirm
termination/connection in
accordance with job
specification
LO 3: Test TLE_IACS
termination/connections S9-
of 12TCEW-
electrical IIIi-j-
wiring/electronics circuits 23
3.1 Conduct complete
testing of
termination/connection of
electrical
wiring/electronics circuits
in
compliance with
specifications and
regulations using
appropriate
procedures and equipment
3.2 Check wirings and
circuits using
specified testing
procedures
3.3 Respond to unplanned
events or
conditions in accordance
with
established procedures
LESSON 6:
TESTING
ELECTRONI
C
COMPONEN
TS (TEC)
LO 1: Determine criteria
for testing
electronics components
1.1 Obtain and clarify work
instructions
based on job order or
client
requirements
The learners 1.2 Consult responsible
demonstrate person for
an effective and proper work
understanding The learners coordination TLE_IACS
of shall be able to 1.3 Obtain and interpret S9-
data 2
concepts and test 12TEC-
Weeks
underlying electronic sheets/application notes IVa-c-
principles in components based on 24
testing manufacturer’s
electronic specifications
components 1.4 Define testing criteria
to ensure that
components meet
technical and
quality requirements
1.5 Document and
communicate testing
criteria to relevant
personnel
LO 2: Plan an approach TLE_IACS
for components S9-
testing 12TEC-
2.1 Identify various testing IVc-e-
methods based 25
on types of electronic
components
2.2 Determine
characteristics and
appropriateness of testing
methods to
be used during
development and on
completion
2.3 Consider/select testing
methods in
relation to appropriate
testing strategy
2.4 Develop plan for
testing components
at specified points during
development and on
completion
2.5 Prepare and check
required test and
measuring instruments and
tools in
accordance with
established
procedures
2.6 Establish records
system to document
testing results, including
problems and
faults
LO 3: Test components TLE_IACS
3.1 Apply appropriate S9-
testing methods to 12TECO-
electronic components in IVf
accordance h-26
to technical specifications
3.2 Detect and record
problems and faults
by testing
3.3 Document remedial
steps
3.4 Resolve detected
problems and faults
during testing in
accordance with
agreed project or industry
practice
3.5 Evaluate final products
against the
determined criteria
3.6 Submit to relevant
personnel the
documented and
summarized
evaluation report of the
testing
process
LO 4: Evaluate the
testing process
4.1 Identify testing
methods that were
successful based on TLE_IACS
industry standards S9-
4.2 Evaluate testing 12TECO-
process and records IVh-j-
system based on standard 27
procedures
4.3 Document test
results/findings for
subsequent testing