CSS Vertical Alignment
CSS Vertical Alignment
SERVICING
LO 3: Test components
3.1 Apply appropriate testing methods to electronic
components in accordance to technical specifications
3.2 Detect and record problems and faults by testing
3.3 Document remedial steps
3.4 Resolve detected problems and faults during testing in
accordance with agreed project or industry practice
3.5 Evaluate final products against the determined criteria
3.6 Submit to relevant personnel the documented and
summarized evaluation report of the testing process
CORE COMPETENCIES I RE
LESSON 8: INSTALLING AND CONFIGURING COMPUTER
SYSTEMS (ICCS)
LO 2. Prepare installer
2.1 Create portable bootable devices in accordance with
software manufacturer instruction
2.2 Prepare customized installers in accordance with software
utilization guide and end user agreement
2.3 Carry out installation of portable applications in accordance
with software user guide and software license