0% found this document useful (0 votes)
267 views

CSS 11 Budgeted Outlay

This document provides an outline for a computer system servicing training program covering multiple lessons from June 2019 to January 2020. The program includes lessons on installing and configuring computer systems, setting up computer networks, and related topics. Each lesson covers objectives, required days, and dates. Activities include assembling computer hardware, installing operating systems and applications, setting up network cables, and testing installed equipment in accordance with safety and documentation standards.

Uploaded by

julius ubas
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
267 views

CSS 11 Budgeted Outlay

This document provides an outline for a computer system servicing training program covering multiple lessons from June 2019 to January 2020. The program includes lessons on installing and configuring computer systems, setting up computer networks, and related topics. Each lesson covers objectives, required days, and dates. Activities include assembling computer hardware, installing operating systems and applications, setting up network cables, and testing installed equipment in accordance with safety and documentation standards.

Uploaded by

julius ubas
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Budgeted Outlay

Computer System Servicing


S.Y. 2019-2020

No.
Content Objectives of Date Remarks
Days

LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS)

Types and parts of LO 1. Assemble computer hardware


computers Computer 1.1 Plan unit assembly to ensure
operating systems OHS policies and procedures are
Windows / MAC OS X followed in accordance with systems
/Linux Peripheral devices requirements 1.2 Prepare unit
Computer systems design assembly to ensure OHS policies and
Computer assembly procedures are followed in
procedures Power ON accordance with systems
self-test and basic-input- requirements 1.3 Identify materials
output-system (BIOS) necessary to complete the work in
configuration procedures accordance with established 16 June 3 - 24,
CMOS Motherboards procedures and check against days 2019
Multimedia storage system requirements 1.4 Obtain
devices: - Video cards - materials necessary to complete the
Sound cards - Graphical work in accordance with established
user interface procedures and check against
system requirements 1.5 Obtain
tools, equipment and testing devices
needed to carry out installation
work in accordance with established
procedures and check for correct
operation and safety 1.6 Assemble
computer hardware in accordance
with established procedures and
system requirements 1.7 Perform
BIOS configuration in accordance
with hardware requirements

TLE_IACSS912ICCS-Ia-e-28

Installers preparation and LO 2. Prepare installer 2.1 Create


OS installation procedures portable bootable devices in
Application and accordance with software
devices/drivers installation manufacturer instruction 8 July 1 – 11,
procedures days 2019

TLE_IACSS912ICCS-If-j-29
Desktop PC interface/ 2.2 Prepare customized installers in
hook up procedures accordance with software utilization
Application packages and guide and end user agreement 2.3
use of application Carry out installation of portable
programs Bootable applications in accordance with
devices - -CD/DVD software user guide and software 16 July 15 –
bootable - -USB bootable license days august 8, 2019
using Rufus software - -USB
bootable using TLE_IACSS912ICCS-If-j-29
diskpart/CMD Software
installers

2nd Quarter
Installation of Operating LO 3. Install operating system and
System - Windows Server drivers for peripherals/ devices 3.1
2008/higher version - Install Operating System (OS) in
Windows XP/7/8/10 accordance with established
Install and configure of installation procedures and to
peripherals devices Install comply with end-user requirements
/Update Operating system 3.2 Install peripherals/ devices in
Checking of work accordance with manufacturer’s
instructions and/ or OS installation 16 August 12 –
procedures 3.3 Configure days September 6,
peripherals/ devices in accordance 2019
with manufacturer’s instructions
and/ or OS installation procedures
3.4 Access OS and drivers updates/
patches in accordance with
manufacturer’s recommendations
and requirements 3.5 Install OS and
drivers updates/ patches in
accordance with manufacturer’s
recommendations and requirements
3.6 Check the quality of the work
undertaken in accordance with
established procedures

TLE_IACSS912ICCS-IIa-j-30

Installation of LO 4. Install application software


applications software with 4.1 Install Application Software
different variations based on software installation 16 September 9
Software updates guides, end-user requirements and days October 4,
Virtualization software software license agreement 2019

TLE_IACSS912ICCS-IIIa-e31
Disk management 4.2 Carry out variation to application
software Antivirus / software in accordance to
diagnostic software customer/ client requirements 4.3
Device drivers Access software updates in 16 October 7 –
Drivers/Software update accordance with manufacturer’s days November 7,
procedures - Application recommendations and requirements 2019
software license 4.4 Install software updates in
agreements - Stress-testing accordance with manufacturer’s
procedures - 5S and 3Rs recommendations and requirements
environmental policies

2nd Quarter
Burning or testing LO 5. Conduct testing and
installed documentation 5.1 Test devices/
equipment/devices systems and/or installation to
Stress test - Processor - determine whether it conforms to
Memory - Hard Disk - Video requirements 5.2 Conduct stress
Card 5S and 3Rs test to ensure reliability of 16 November 11
environmental policies equipment in accordance with days – December 5,
Reporting and manufacturer’s instructions and 2019
documentation procedures system requirements 5.3 Follow 5S
and 3Rs according to environmental
policies 5.4 Follow procedures in
forwarding documentation to
appropriate personnel and/or
authority on the test conducted.

TLE_IACSS912ICCS-IIIf-j-32

LESSON 9. SETTING-UP COMPUTER NETWORKS (SUCN)

Computer network LO 1 Install network cables 1.1 Plan


concepts Network cable cable routes in accordance with
installation Copper cable network design and actual
splicing and cable testing installation site 1.2 Determine cable
Fiber optic cables splicing routes in accordance with network
and installation design and actual installation site 16 December 9-
requirements Philippine 1.3 Identify necessary network days January 16,
Electrical Code relevant to materials in accordance with 2020
data connection OHS established procedures and check
standards and 5S principles against system requirements 1.4
Obtain necessary network materials
in accordance with established
procedures and check against
system requirements

TLE_IACSS912SUCN-IVa-j-33

3rd Quarter
Practicing 3Rs (reduce, 1.5 Obtain tools, equipment, and
reuse, recycle/recover) testing devices in accordance with
3Rs environmental policies established procedures 1.6 Check
Managing waste from tools, equipment and testing devices
electrical and electronic in accordance with established
equipment (WEEE) procedures 1.7 Follow OHS policies
1.8 Use appropriate PPE 1.9 Perform
copper cable splicing based on
Electronic Industries Alliance /
Telecommunications Industry
Association (EIA/TIA) standards 1.10 8 January 20 –
Install network cables and cable days 30, 2020
raceways in accordance with
established procedures and
installation requirements 1.11
Perform installation work and check
for unnecessary damage that has
occurred and complies with
requirements 1.12 Follow OHS
standards and 5S principles
according to enterprise
requirements 1.13 Dispose excess
components and materials based on
WEEE directives and 3Rs waste
management program

TLE_IACSS912SUCN-IVa-j-33

network design LO 2: Set network configuration 2.1


addressing subnetting Check network connectivity of each
topology router/Wi-fi/ terminal in accordance with network
wireless access design 2.2 Diagnose and repair any
point/repeater problem or fault in the network
configuration Network system in line with standard
Interface Card (NIC) operating procedures 2.3 Configure
8 February 3 -
settings network cables Network Interface Card (NIC) in
days 13, 2019
cable raceways/ducts accordance with the network design
Network connectivity 2.4 Carry out communication check
checking procedures and between terminals in accordance
techniques - Ping - Netstat with operating systems network
- IP config configuration guides 2.5 Respond to
unplanned events or conditions in
accordance with established
procedures

TLE_IACSS912SUCN-Ia-e-34

You might also like