The document outlines a curriculum focused on installing and configuring computer systems, including hardware assembly, operating systems, and application software. It emphasizes core competencies and learning outcomes for students, detailing procedures for installation, testing, and network setup while adhering to safety and environmental standards. The curriculum spans a total of 10 weeks, with specific lessons on various aspects of computer systems and networks.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
6 views
CSS_GRADE10_CG_I-IV
The document outlines a curriculum focused on installing and configuring computer systems, including hardware assembly, operating systems, and application software. It emphasizes core competencies and learning outcomes for students, detailing procedures for installation, testing, and network setup while adhering to safety and environmental standards. The curriculum spans a total of 10 weeks, with specific lessons on various aspects of computer systems and networks.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4
CONTENT LEARNING COMPETENCIES CODES
CORE COMPETENCIES The learners demonstrate The learners shall be able
LESSON Desktop8: PCINSTALLING AND an interface/ hook CONFIGURING understandingCOMPUTER of SYSTEMS to (ICCS) install and configure 2.2 Prepare customized CONTENT up procedures concepts CONTENT andSTANDARD principles in computer PERFORMANCE systems based on LEARNING installers in accordance with CODES Application packages and installing configuring established STANDARDprocedures and COMPETENCIES software utilization guide and use of application programs computer The learnerssystems demonstrate system requirements LO end1. Assemble user agreement TLE_IACSS9-12ICCS-Ia-e-28 Types and parts of Bootable devices computers an understanding of The learners shall be able computer 2.3 Carry out hardware installation of --CD/DVD bootable Computer operating concepts and principles in to install and configure 1.1 Plan unit portable assemblyinto applications -systems -USB bootable using Rufus installing configuring computer systems based ensure OHS with accordance policies and user software software Windows / MAC OS X computer systems on established procedures procedures are followed guide and software in license -/Linux -USB bootable using and system requirements accordance with systems NOTE: FIVE WEEKS diskpart/CMD Peripheral devices requirements Software Computerinstallers systems design 1.2 Prepare unit assembly TIME FRAME: SEPTEMBER 4 – Computer assembly to ensure OHS policies and OCTOBER 2 procedures procedures are followed LO 3. Install operating in TLE_IACSS9-12ICCS-IIa-j-30 Installation of Operating Power ON self-test and accordance system andwith systems drivers for System basic-input-output-system requirements peripherals/ devices 10 weeks -(BIOS) Windows Server configuration 1.3 3.1 Identify materialsSystem Install Operating 2008/higher procedures version necessary to complete (OS) in accordance withthe -Windows CMOS XP/7/8/10 work in accordance established with installation Install and configure of Motherboards established procedures and procedures to complyandwith peripherals Multimedia devices storage check end-useragainst system requirements Install /Update Operating devices: requirements 3.2 Install peripherals/ devices system - Video cards 1.4 Obtain materials in accordance with Checking - Sound of work cards necessary manufacturer’sto complete the and/ instructions - Graphical user interface work in accordance with or OS installation procedures established 3.3 Configure procedures peripherals/and check devices against system with in accordance requirements manufacturer’s instructions and/ 1.5 Obtain or OS tools, equipment installation procedures and testing OS 3.4 Access devices needed and drivers to carry out updates/ installation patches in accordance work in accordance with with manufacturer’s established recommendations proceduresand and check for requirementscorrect operation and safetyOS and drivers 3.5 Install 1.6 Assemble updates/ patches computer in accordance hardware in accordance with manufacturer’s with established and recommendations procedures requirements and system requirements 3.6 Check the quality of the 1.7 workPerform BIOS in accordance undertaken configuration with established in accordance procedures with hardware requirements LO 4. Install application TLE_IACSS9-12ICCS-IIIa-e-31 Installation of applications The learners demonstrate The learners shall be able LO 2. Prepare installer software TLE_IACSS9-12ICCS-If-j-29 Installers software preparation with different and an understanding of to install and configure 2.1 4.1 Create portable bootable Install Application Software 5 weeks OS installation procedures variations concepts and principles in computer systems based on devices based on insoftware accordance with installation Application Software and updates installing configuring established procedures and software manufacturer guides, end-user requirements devices/drivers installation Virtualization software computer systems system requirements instruction and software license agreement procedures Disk management software 4.2 Carry out variation to Antivirus / diagnostic application software in LO 5. Conduct testing and TLE_IACSS9-12ICCS-IIIf-j- Burning or testing installed documentation 32 equipment/devices 5.1 Test devices/ systems Stress test and/or installation to 5 weeks - Processor determine whether it - Memory conforms to requirements Total of 10 weeks - Hard Disk 5.2 Conduct stress test to - Video Card ensure reliability of equipment 5S and 3Rs environmental in accordance with policies manufacturer’s instructions Reporting and and system requirements documentation procedures 5.3 Follow 5S and 3Rs according to environmental policies 5.4 Follow procedures in forwarding documentation to appropriate personnel and/or authority on the test conducted.
LESSON 9. SETTING-UP COMPUTER NETWORKS (SUCN)
The learners demonstrate The learners shall be able to LO 1 Install network TLE_IACSS9-12SUCN-IVa- Computer network an understanding of set up computer networks cables j-33 concepts concepts and principles in based established procedures 1.1 Plan cable routes in Network cable installation setting up computer and system requirements for accordance with network Copper cable splicing and networks hardware design and actual 10 weeks cable testing installation site Fiber optic cables splicing 1.2 Determine cable routes and installation in accordance with network requirements design and actual Philippine Electrical Code installation site relevant to data connection 1.3 Identify necessary OHS standards and 5S network materials in principles accordance with established procedures and check against system requirements 1.4 Obtain necessary network materials in accordance with established procedures and check against system requirements
1.5 Obtain tools,
Practicing 3Rs (reduce, equipment, and testing reuse, recycle/recover) devices in accordance with 3Rs environmental established procedures policies 1.6 Check tools, equipment Managing waste from and testing devices in electrical and electronic accordance with equipment (WEEE) established procedures 1.7 Follow OHS policies 1.8 Use appropriate PPE 1.9 Perform copper cable splicing based on Electronic Industries Alliance / Telecommunications Industry Association (EIA/TIA) standards 1.10 Install network cables and cable raceways in accordance with established procedures and installation requirements 1.11 Perform installation work and check for unnecessary damage that has occurred and complies with requirements 1.12 Follow OHS standards and 5S principles according to enterprise requirements 1.13 Dispose excess components and materials based on WEEE directives and 3Rs waste management program