0% found this document useful (0 votes)
16 views6 pages

Budget of Lessons ICT CSS 9 Q1 Q4

Uploaded by

jayr abantao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views6 pages

Budget of Lessons ICT CSS 9 Q1 Q4

Uploaded by

jayr abantao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Republic of the Philippines

Department of Education
REGION VIII
HINABANGAN NATIONAL HIGH SCHOOL
Hinabangan, Samar
School ID: 303606

School Year 2025-2026


QUARTER 1 - 4
Computer System Servicing - 9

BUDGET OF LESSON
PERFORMANCE
WEEK # CONTENT CONTENT STANDARD LEARNING COMPETENCIES CODE
STANDARD
FIRST QUARTER:
WEEK 1  Types and parts of The learners demonstrate The learners shall be able 1.1 Plan unit assembly to ensure TLE_IACSS9-
computers an understanding of to install and configure OHS policies and procedures are 12ICCS-Ia-e-28
 Computer operating concepts and principles in computer systems based followed in accordance with
systems installing configuring on established procedures systems requirements
 Windows / MAC OS computer systems. and system requirements. 1.2 Prepare unit assembly to ensure
X /Linux OHS policies and procedures are
 Peripheral devices followed in accordance with
 Computer systems systems requirements
design 1.3 Identify materials necessary to
WEEK 2 & 3  Computer assembly complete the work in accordance
procedures with established procedures and
 Power ON self-test check against system
and basic-input- requirements
output-system 1.4 Obtain materials necessary to
(BIOS) configuration complete the work in accordance
procedures with established procedures and
WEEK 4  CMOS check against system

Page 1 of 6
Department of Education, Hinabangan National High School

 Motherboards requirements
WEEK 5  Multimedia storage 1.5 Obtain tools, equipment and
devices: testing devices needed to carry
o Video cards out installation work in
o Sound cards accordance with established
Graphical user procedures and check for correct
interface operation and safety
1.6 Assemble computer hardware in
accordance with established
procedures and system
requirements
1.7 Perform BIOS configuration in
accordance with hardware
requirements
WEEK 6  Installers preparation The learners demonstrate The learners shall be able 2.1 Create portable bootable devices TLE_IACSS9-
and OS installation an understanding of to install and configure in accordance with software 12ICCS-If-j-29
procedures concepts and principles in computer systems based manufacturer instruction
WEEK 7  Application and installing configuring on established procedures 2.2 Prepare customized installers in
devices/drivers computer systems. and system requirements. accordance with software
installation utilization guide and end user
procedures agreement
WEEK 8  Desktop PC 2.3 Carry out installation of portable
interface/ hook up applications in accordance with
procedures software user guide and software
WEEK 9  Application license
packages and use of
application programs
WEEK 10  Bootable devices
o CD/DVD
bootable
o USB bootable
using Rufus
software
o USB bootable
using
diskpart/CMD
Software installers

Page 2 of 6
Department of Education, Hinabangan National High School

SECOND QUARTER:
WEEK 1 – 5  Installation of The learners demonstrate The learners shall be able 3.1 Install Operating System (OS) in TLE_IACSS9-
Operating System an understanding of to install and configure accordance with established 12ICCS-IIa-j-30
o Windows Server concepts and principles in computer systems based installation procedures and to
2008/higher installing configuring on established procedures comply with end-user
version computer systems. and system requirements. requirements
o Windows 3.2 Install peripherals/ devices in
XP/7/8/10 accordance with manufacturer’s
WEEK 6 – 7  Install and configure instructions and/ or OS
of peripherals devices installation procedures
3.3 Configure peripherals/ devices in
WEEK 8 – 9  Install /Update accordance with manufacturer’s
Operating system instructions and/ or OS
installation procedures
WEEK 10  Checking of work 3.4 Access OS and drivers updates/
patches in accordance with
manufacturer’s recommendations
and requirements
3.5 Install OS and drivers updates/
patches in accordance with
manufacturer’s recommendations
and requirements
3.6 Check the quality of the work
undertaken in accordance with
established procedures
THIRD QUARTER:
WEEK 1  Installation of The learners demonstrate The learners shall be able 4.1 Install Application Software based TLE_IACSS9-
applications software an understanding of to install and configure on software installation guides, 12ICCS-IIIa-e-31
with different concepts and principles in computer systems based end-user requirements and
variations installing configuring on established procedures software license agreement
WEEK 2  Software updates computer systems. and system requirements. 4.2 Carry out variation to application
WEEK 3  Virtualization software software in accordance to
 Disk management customer/ client requirements
software 4.3 Access software updates in

Page 3 of 6
Department of Education, Hinabangan National High School

WEEK 4  Antivirus / diagnostic accordance with manufacturer’s


software recommendations and
requirements
WEEK 5  Device drivers 4.4 Install software updates in
 Drivers/Software accordance with manufacturer’s
update procedures recommendations and
o Application requirements
software license
agreements
o Stress-testing
procedures
 - 5S and 3Rs
environmental
policies
WEEK 6 & 7  Burning or testing 5.1 Test devices/ systems and/or TLE_IACSS9-
installed installation to determine whether 12ICCS-IIIf-j-32
equipment/devices it conforms to requirements
WEEK 8  Stress test 5.2 Conduct stress test to ensure
o Processor reliability of equipment in
o Memory accordance with manufacturer’s
o Hard Disk instructions and system
o Video Card requirements
WEEK 9  5S and 3Rs 5.3 Follow 5S and 3Rs according to
environmental environmental policies
policies 5.4 Follow procedures in forwarding
WEEK 10  Reporting and documentation to appropriate
documentation personnel and/or authority on the
procedures test conducted.
FOURTH QUARTER:
WEEK 1  Computer network The learners demonstrate The learners shall be able 1.1 Plan cable routes in accordance TLE_IACSS9-
concepts an understanding of to set up computer with network design and actual 12SUCN-IVa-j-33
concepts and principles in networks based installation site
setting up computer established procedures 1.2 Determine cable routes in
WEEK 2 – 5  Network cable networks. and system requirements accordance with network design
installation for hardware. and actual installation site
 Copper cable 1.3 Identify necessary network

Page 4 of 6
Department of Education, Hinabangan National High School

splicing and cable materials in accordance with


testing established procedures and
 Fiber optic cables check against system
splicing and requirements
installation 1.4 Obtain necessary network
requirements materials in accordance with
established procedures and
WEEK 6  Philippine Electrical check against system
Code relevant to requirements
data connection 1.5 Obtain tools, equipment, and
testing devices in accordance
WEEK 7  OHS standards and with established procedures
5S principles 1.6 Check tools, equipment and
testing devices in accordance
WEEK 8  Practicing 3Rs with established procedures
(reduce, reuse, 1.7 Follow OHS policies
recycle/recover) 1.8 Use appropriate PPE
1.9 Perform copper cable splicing
WEEK 9  3Rs environmental based on Electronic Industries
policies Alliance / Telecommunications
WEEK 10  Managing waste Industry Association (EIA/TIA)
from electrical and standards
electronic equipment 1.10 Install network cables and cable
(WEEE) raceways in accordance with
established procedures and
installation requirements
1.11 Perform installation work and
check for unnecessary damage
that has occurred and complies
with requirements
1.12 Follow OHS standards and 5S
principles according to enterprise
requirements
1.13 Dispose excess components
and materials based on WEEE
directives and 3Rs waste
management program

Page 5 of 6
Department of Education, Hinabangan National High School

LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS) LESSON 9: SETTING- UP COMPUTER
NETWORKS (SUCN)
Learning Outcome 1 – Assemble Computer Hardware Learning Outcome 1 – Install Network Cables
Learning Outcome 2 – Prepare Installer
Learning Outcome 3 – Installing Operating System and Drivers for Peripherals / Devices
Learning Outcome 4 – Installing Application Software
Learning Outcome 5 – Conduct Testing and Documentation

Prepared by: Checked by:

VICTOR A. ABANTAO JR. CESARIO A. UY JR.


Secondary School Teacher III MT-I/TLE Department
Head

Noted:

JORGE N. PANICAN
School Head

Page 6 of 6

You might also like