BUDGET OF WORK
PERFORMANCE
WEEK # CONTENT CONTENT STANDARD LEARNING COMPETENCIES CODE
STANDARD
FIRST QUARTER:
WEEK 1 Types and parts of The learners demonstrate The learners shall be able 1.1 Plan unit assembly to ensure TLE_IACSS9-
computers an understanding of to install and configure OHS policies and procedures are 12ICCS-Ia-e-28
Computer operating concepts and principles in computer systems based followed in accordance with
systems installing configuring on established procedures systems requirements
Windows / MAC OS computer systems. and system requirements. 1.2 Prepare unit assembly to ensure
X /Linux OHS policies and procedures are
Peripheral devices followed in accordance with
Computer systems systems requirements
design 1.3 Identify materials necessary to
WEEK 2 & 3 Computer assembly complete the work in accordance
procedures with established procedures and
Power ON self-test check against system
and basic-input- requirements
Leyte National High School Page 1 of 6
Mabini St., Poblacion, Leyte, Leyte
09171335316; 09171335230; (053)839-8234; (053)839-8374
303390@deped.gov.ph
Coming together is a SUCCESS, LNHS is a better place.
Department of Education, Leyte National High School
using Rufus
software
o USB bootable
using
diskpart/CMD
Software installers
SECOND QUARTER:
WEEK 1 – 5 Installation of The learners demonstrate The learners shall be able 3.1 Install Operating System (OS) in TLE_IACSS9-
Operating System an understanding of to install and configure accordance with established 12ICCS-IIa-j-30
o Windows Server concepts and principles in computer systems based installation procedures and to
2008/higher installing configuring on established procedures comply with end-user
version computer systems. and system requirements. requirements
o Windows 3.2 Install peripherals/ devices in
XP/7/8/10 accordance with manufacturer’s
WEEK 6 – 7 Install and configure instructions and/ or OS
of peripherals devices installation procedures
3.3 Configure peripherals/ devices in
WEEK 8 – 9 Install /Update accordance with manufacturer’s
Operating system instructions and/ or OS
installation procedures
WEEK 10 Checking of work 3.4 Access OS and drivers updates/
patches in accordance with
manufacturer’s recommendations
and requirements
3.5 Install OS and drivers updates/
patches in accordance with
manufacturer’s recommendations
and requirements
3.6 Check the quality of the work
undertaken in accordance with
established procedures
THIRD QUARTER:
WEEK 1 Installation of The learners demonstrate The learners shall be able 4.1 Install Application Software based TLE_IACSS9-
applications software an understanding of to install and configure on software installation guides, 12ICCS-IIIa-e-31
with different concepts and principles in computer systems based end-user requirements and
variations installing configuring on established procedures software license agreement
WEEK 2 Software updates computer systems. and system requirements. 4.2 Carry out variation to application
WEEK 3 Virtualization software software in accordance to
Disk management customer/ client requirements
software 4.3 Access software updates in
accordance with manufacturer’s
WEEK 4 Antivirus / diagnostic
recommendations and
software
requirements
WEEK 5 Device drivers 4.4 Install software updates in
Drivers/Software accordance with manufacturer’s
update procedures recommendations and
o Application requirements
software license
agreements
o Stress-testing
procedures
- 5S and 3Rs
environmental
policies
WEEK 6 & 7 Burning or testing 5.1 Test devices/ systems and/or TLE_IACSS9-
installed installation to determine whether 12ICCS-IIIf-j-32
equipment/devices it conforms to requirements
WEEK 8 Stress test 5.2 Conduct stress test to ensure
o Processor reliability of equipment in
o Memory accordance with manufacturer’s
o Hard Disk instructions and system
o Video Card requirements
WEEK 9 5S and 3Rs 5.3 Follow 5S and 3Rs according to
environmental environmental policies
policies 5.4 Follow procedures in forwarding
WEEK 10 Reporting and documentation to appropriate
documentation personnel and/or authority on the
procedures test conducted.
THIRD QUARTER:
WEEK 1 Computer network The learners demonstrate The learners shall be able 1.1 Plan cable routes in accordance TLE_IACSS9-
concepts an understanding of to set up computer with network design and actual 12SUCN-IVa-j-33
concepts and principles in networks based installation site
setting up computer established procedures 1.2 Determine cable routes in
WEEK 2 – 5 Network cable networks. and system requirements accordance with network design
installation for hardware. and actual installation site
Copper cable 1.3 Identify necessary network
splicing and cable materials in accordance with
testing established procedures and
Fiber optic cables check against system
splicing and requirements
installation 1.4 Obtain necessary network
requirements materials in accordance with
established procedures and
WEEK 6 Philippine Electrical check against system
Code relevant to requirements
data connection 1.5 Obtain tools, equipment, and
testing devices in accordance
WEEK 7 OHS standards and with established procedures
5S principles 1.6 Check tools, equipment and
testing devices in accordance
WEEK 8 Practicing 3Rs with established procedures
(reduce, reuse, 1.7 Follow OHS policies
recycle/recover) 1.8 Use appropriate PPE
1.9 Perform copper cable splicing
WEEK 9 3Rs environmental based on Electronic Industries
policies Alliance / Telecommunications
WEEK 10 Managing waste Industry Association (EIA/TIA)
from electrical and standards
electronic equipment 1.10 Install network cables and cable
(WEEE) raceways in accordance with
established procedures and
installation requirements
1.11 Perform installation work and